| (J1) |
Job 1 |
整车投产 |
| 2/4-WD |
Two/Four Wheel Drive |
2/4轮驱动 |
| APQP |
Advanced product Quality Planning |
先期产品质量规划 |
| BOM |
Bill Of Material |
物料清单 |
| CPA |
Commercial and Program Agreement |
商务项目协议 |
| DB |
Durability Build |
样车阶段 |
| DFMEA |
Design Failure Mode Effect Analysis |
潜在失效模式及后果分析设计 |
| DV |
Design Verification |
设计验证 |
| DVP |
Design Verification Plan |
设计验证计划 |
| ED&T |
Engineering Development and Test |
工程开发和测试 |
| FDJ |
Final Data Judgement |
最终资料评价 |
| FEC |
Final Engineering |
最终工程完成 |
| FMEA |
Failure Mode Effect |
故障模式影响分析 |
| FMEA |
Failure Mode Effect |
潜在失效模式及后果分析 |
| FPDS |
Ford product Development System |
福特产品开发系统 |
| FRG |
Ford Reliability Guideline |
福特可靠性指导 |
| FtF/F2F |
Face To Face |
面对面会议 |
| GPDS |
Global Product Development System |
全球产品开发体系 |
| GYR |
Gree-Yellow-Red |
绿-黄-红 |
| IPD |
In Plant Date |
进厂日 |
| IPO |
Individual Part Order |
单个零件订单 |
| ISIR |
Initial Sample Inspection Report |
初始样件检查报告 |
| JIT |
Just In Time |
及时 |
| KO |
Kick-Off |
启动 |
| LR |
Lunch Readiness |
发布准备 |
| LS |
Lunch Support |
发布支持 |
| MP1 |
Mass Production 1 |
量产1 |
| MPV |
Multi-Purpose Vehicle |
多用途汽车 |
| MRD |
Material Required Date |
物料要求到厂日 |
| MRO |
Maitenance,Repair and Operation |
维护、修理和运行 |
| MSA |
Manufacturing Site Assess |
制造现场审核 |
| MTP |
Make To Print supplier |
照图加工供应商 |
| N/A |
Not Applicable |
不适用 |
| NTEI |
New Tooled End item |
全新开模产品 |
| OEM |
Original Equipment Manufacturer |
设备最初制造商 |
| OTS |
Off-Tooling-Sample |
完全工装样件 |
| OTT |
OK TO TOOL |
可以开模 |
| PA |
Program Approval |
项目批准 |
| PDL |
Product Design Letter |
产品设计函件 |
| PEC |
Preliminary Engineering competion |
初步工程完成 |
| PO |
Purchase Order |
采购订单 |
| PP |
Pilot Produciton |
试制生产 |
| PP |
Production Proveout |
生产验证 |
| PPAP |
Production Part Approval Process |
生产件批准流程 |
| PPM |
Parts Per Million |
零件的百万分比率(适用于供应商不合格零件) |
| PPSR |
Product Prepare Status Report |
产品准备状态报告 |
| PPV |
Pre-Production Validation |
产品预先验证 |
| PQA |
Process Quality assurance |
过程质量保证 |
| PSW |
Parts Submission Warrant |
零件提交保证书 |
| PT |
Product Trial |
试生产 |
| PTC |
Program Target |
项目目标整合 |
| PV |
Production Validation |
产品验证 |
| QOS |
Quality Operating System |
质量运作体系 |
| QR |
Quality Reject |
质量拒收 |
| RFQ |
Request For Quotation |
询价 |
| SA |
Sourcing Agreement |
选点协议 |
| SOP |
Standard Operation Precess |
标准操作程序 |
| SOP |
Standard Operation |
批量生产 |
| SQA |
Supplier Quality Assurance |
供应商质量保证 |
| SUV |
Sports Utility Vehicle |
运动型汽车 |
| TKO |
Tooling Kick-Off |
工装启动 |
| TS-16949 |
Technical Specification- 16949 |
技术规范-16949 |
| TT |
Tooling Trial |
工装治具测试 |
| TTO |
Tool Try-Out |
工装设备试运行 |
| VO |
Vehicle Operation |
主机厂 |
| VP |
Verification Prototype |
样件验证 |
| VPP |
Vehicle Program Plan |
整车项目计划